Generating a better life for future generations
Title (generic)
Newspaper
Accession No.

Generating a better life for future generations: History of water power in Lawrence, MA. Article prompted by the construction of a 23.4 million dollar project which included a hydroelectric power plant and fish ladder. Site is at existing Essex Company Dam on the Merrimack River and is to generate power by 1981. The article states, " The plant will cause no environmental problems in the area. In fact, the fishway will help anadromous fish - fish that must swim upstream to spawn- return to the Merrimack." Article includes sketches, history and plans.
Material for the special section was compiled and edited by Jack freeman of the Editorial Department, with much assistance from Phil Pelletier of the Retail Advertising Department

publication place: Lawrence, MA

Author
Freedman, Jack
Publisher
Lawrence Eagle Tribune
Date (created)
06/16/79
Format
paper, 16 pages 8.5 x 11 in; photocopy

Irish Library/David Burke/

Language
English

2006.054.026

Created:
Author: Amita Kiley
Location
2nd Floor Stacks - 2006
Condition
Fair
Display Value
Fair
Cataloged By
Brown, Barbara
Cataloged On
Title
Generating a better life for future generations
Title (generic)
Newspaper
Accession No.

Generating a better life for future generations: History of water power in Lawrence, MA. Article prompted by the construction of a 23.4 million dollar project which included a hydroelectric power plant and fish ladder. Site is at existing Essex Company Dam on the Merrimack River and is to generate power by 1981. The article states, " The plant will cause no environmental problems in the area. In fact, the fishway will help anadromous fish - fish that must swim upstream to spawn- return to the Merrimack." Article includes sketches, history and plans.
Material for the special section was compiled and edited by Jack freeman of the Editorial Department, with much assistance from Phil Pelletier of the Retail Advertising Department

publication place: Lawrence, MA

Author
Freedman, Jack
Publisher
Lawrence Eagle Tribune
Date (created)
06/16/79
Format
paper, 16 pages 8.5 x 11 in; photocopy

Irish Library/David Burke/

Language
English

2006.054.026

Created:
Author: Amita Kiley
Location
2nd Floor Stacks - 2006
Condition
Fair
Display Value
Fair
Cataloged By
Brown, Barbara
Cataloged On
Title
Generating a better life for future generations
Title (generic)
Newspaper
Accession No.

Generating a better life for future generations: History of water power in Lawrence, MA. Article prompted by the construction of a 23.4 million dollar project which included a hydroelectric power plant and fish ladder. Site is at existing Essex Company Dam on the Merrimack River and is to generate power by 1981. The article states, " The plant will cause no environmental problems in the area. In fact, the fishway will help anadromous fish - fish that must swim upstream to spawn- return to the Merrimack." Article includes sketches, history and plans.
Material for the special section was compiled and edited by Jack freeman of the Editorial Department, with much assistance from Phil Pelletier of the Retail Advertising Department

publication place: Lawrence, MA

Author
Freedman, Jack
Publisher
Lawrence Eagle Tribune
Date (created)
06/16/79
Format
paper, 16 pages 8.5 x 11 in; photocopy

Irish Library/David Burke/

Language
English

2006.054.026

Created:
Author: Amita Kiley
Location
2nd Floor Stacks - 2006
Condition
Fair
Display Value
Fair
Cataloged By
Brown, Barbara
Cataloged On
Title
Generating a better life for future generations
Title (generic)
Newspaper
Accession No.

Generating a better life for future generations: History of water power in Lawrence, MA. Article prompted by the construction of a 23.4 million dollar project which included a hydroelectric power plant and fish ladder. Site is at existing Essex Company Dam on the Merrimack River and is to generate power by 1981. The article states, " The plant will cause no environmental problems in the area. In fact, the fishway will help anadromous fish - fish that must swim upstream to spawn- return to the Merrimack." Article includes sketches, history and plans.
Material for the special section was compiled and edited by Jack freeman of the Editorial Department, with much assistance from Phil Pelletier of the Retail Advertising Department

publication place: Lawrence, MA

Author
Freedman, Jack
Publisher
Lawrence Eagle Tribune
Date (created)
06/16/79
Format
paper, 16 pages 8.5 x 11 in; photocopy

Irish Library/David Burke/

Language
English

2006.054.026

Created:
Author: Amita Kiley
Location
2nd Floor Stacks - 2006
Condition
Fair
Display Value
Fair
Cataloged By
Brown, Barbara
Cataloged On
Title
Generating a better life for future generations
Title (generic)
Newspaper
Accession No.

Generating a better life for future generations: History of water power in Lawrence, MA. Article prompted by the construction of a 23.4 million dollar project which included a hydroelectric power plant and fish ladder. Site is at existing Essex Company Dam on the Merrimack River and is to generate power by 1981. The article states, " The plant will cause no environmental problems in the area. In fact, the fishway will help anadromous fish - fish that must swim upstream to spawn- return to the Merrimack." Article includes sketches, history and plans.
Material for the special section was compiled and edited by Jack freeman of the Editorial Department, with much assistance from Phil Pelletier of the Retail Advertising Department

publication place: Lawrence, MA

Author
Freedman, Jack
Publisher
Lawrence Eagle Tribune
Date (created)
06/16/79
Format
paper, 16 pages 8.5 x 11 in; photocopy

Irish Library/David Burke/

Language
English

2006.054.026

Created:
Author: Amita Kiley
Location
2nd Floor Stacks - 2006
Condition
Fair
Display Value
Fair
Cataloged By
Brown, Barbara
Cataloged On
Title
Generating a better life for future generations
Title (generic)
Newspaper
Accession No.

Generating a better life for future generations: History of water power in Lawrence, MA. Article prompted by the construction of a 23.4 million dollar project which included a hydroelectric power plant and fish ladder. Site is at existing Essex Company Dam on the Merrimack River and is to generate power by 1981. The article states, " The plant will cause no environmental problems in the area. In fact, the fishway will help anadromous fish - fish that must swim upstream to spawn- return to the Merrimack." Article includes sketches, history and plans.
Material for the special section was compiled and edited by Jack freeman of the Editorial Department, with much assistance from Phil Pelletier of the Retail Advertising Department

publication place: Lawrence, MA

Author
Freedman, Jack
Publisher
Lawrence Eagle Tribune
Date (created)
06/16/79
Format
paper, 16 pages 8.5 x 11 in; photocopy

Irish Library/David Burke/

Language
English

2006.054.026

Created:
Author: Amita Kiley
Location
2nd Floor Stacks - 2006
Condition
Fair
Display Value
Fair
Cataloged By
Brown, Barbara
Cataloged On
Title
Generating a better life for future generations
Title (generic)
Newspaper
Accession No.

Generating a better life for future generations: History of water power in Lawrence, MA. Article prompted by the construction of a 23.4 million dollar project which included a hydroelectric power plant and fish ladder. Site is at existing Essex Company Dam on the Merrimack River and is to generate power by 1981. The article states, " The plant will cause no environmental problems in the area. In fact, the fishway will help anadromous fish - fish that must swim upstream to spawn- return to the Merrimack." Article includes sketches, history and plans.
Material for the special section was compiled and edited by Jack freeman of the Editorial Department, with much assistance from Phil Pelletier of the Retail Advertising Department

publication place: Lawrence, MA

Author
Freedman, Jack
Publisher
Lawrence Eagle Tribune
Date (created)
06/16/79
Format
paper, 16 pages 8.5 x 11 in; photocopy

Irish Library/David Burke/

Language
English

2006.054.026

Created:
Author: Amita Kiley
Location
2nd Floor Stacks - 2006
Condition
Fair
Display Value
Fair
Cataloged By
Brown, Barbara
Cataloged On
Title
Generating a better life for future generations
Title (generic)
Newspaper
Accession No.

Generating a better life for future generations: History of water power in Lawrence, MA. Article prompted by the construction of a 23.4 million dollar project which included a hydroelectric power plant and fish ladder. Site is at existing Essex Company Dam on the Merrimack River and is to generate power by 1981. The article states, " The plant will cause no environmental problems in the area. In fact, the fishway will help anadromous fish - fish that must swim upstream to spawn- return to the Merrimack." Article includes sketches, history and plans.
Material for the special section was compiled and edited by Jack freeman of the Editorial Department, with much assistance from Phil Pelletier of the Retail Advertising Department

publication place: Lawrence, MA

Author
Freedman, Jack
Publisher
Lawrence Eagle Tribune
Date (created)
06/16/79
Format
paper, 16 pages 8.5 x 11 in; photocopy

Irish Library/David Burke/

Language
English

2006.054.026

Created:
Author: Amita Kiley
Location
2nd Floor Stacks - 2006
Condition
Fair
Display Value
Fair
Cataloged By
Brown, Barbara
Cataloged On
Title
Generating a better life for future generations
Title (generic)
Newspaper
Accession No.

Generating a better life for future generations: History of water power in Lawrence, MA. Article prompted by the construction of a 23.4 million dollar project which included a hydroelectric power plant and fish ladder. Site is at existing Essex Company Dam on the Merrimack River and is to generate power by 1981. The article states, " The plant will cause no environmental problems in the area. In fact, the fishway will help anadromous fish - fish that must swim upstream to spawn- return to the Merrimack." Article includes sketches, history and plans.
Material for the special section was compiled and edited by Jack freeman of the Editorial Department, with much assistance from Phil Pelletier of the Retail Advertising Department

publication place: Lawrence, MA

Author
Freedman, Jack
Publisher
Lawrence Eagle Tribune
Date (created)
06/16/79
Format
paper, 16 pages 8.5 x 11 in; photocopy

Irish Library/David Burke/

Language
English

2006.054.026

Created:
Author: Amita Kiley
Location
2nd Floor Stacks - 2006
Condition
Fair
Display Value
Fair
Cataloged By
Brown, Barbara
Cataloged On
Title
Generating a better life for future generations
Title (generic)
Newspaper
Accession No.

Generating a better life for future generations: History of water power in Lawrence, MA. Article prompted by the construction of a 23.4 million dollar project which included a hydroelectric power plant and fish ladder. Site is at existing Essex Company Dam on the Merrimack River and is to generate power by 1981. The article states, " The plant will cause no environmental problems in the area. In fact, the fishway will help anadromous fish - fish that must swim upstream to spawn- return to the Merrimack." Article includes sketches, history and plans.
Material for the special section was compiled and edited by Jack freeman of the Editorial Department, with much assistance from Phil Pelletier of the Retail Advertising Department

publication place: Lawrence, MA

Author
Freedman, Jack
Publisher
Lawrence Eagle Tribune
Date (created)
06/16/79
Format
paper, 16 pages 8.5 x 11 in; photocopy

Irish Library/David Burke/

Language
English